Week In Pictures: High Tunnel 2
-
Bows are assembled and up, things are starting to come together -
Next we added the purlins to tie the bows into each other and give regidity -
The master carpenter hard at work, building end walls -
After purlins are installed the cross bracing and cross ties are assembled, these are the final steps for metal farming portion of the structure -
Base boards and hip boards have been installed and fastened down -
We simplified our end walls this year, making the process much faster, we are so close to adding the polycarbonate -
We subsoiled the high tunnel after all the grading and leveling the ground, time to get a cover crop in -
Were we are marking and drilling the channel for the wiggle wire going in for the plastic cover -
The Bardwell team hard at work -
The Bardwell team hard at work -
Digging holes for the posts for end walls -