2019 Projects Year in Review
We arranged all of pictures below in chronological order from the start of the season to the present.
Scroll down to see how far we have come!
Installing electrical conduit in HT1
Organizing pipes for HT2 and finishing ground leveling
Ground has been leveled and piping and bows starting to get installed for HT2 and GH1
Starting end wall construction on HT2 and digging the roadway for all the greenhouses
More road construction and getting ready to put fill in
Digging trenches for water pipes for all greenhouse 5' down
Materials for HT2 and GH1, endwall and plastic
The endwalls are underway
Digging test well points for our irrigation system to ensure good water flow
HT2 is ready for plastic, an exciting moment in August
Installing electrical conduit for all 3 structures
The main lead for electricity to all structures
Three well points going in for 3 greenhouses
These are precast hictical pears that we are putting in for the "Tool Shed" for the irrigation pump and electrical panel
Mixing and poring concrete for new foundations under the back barns
Plastic going on HT2, thank you to the crew who came to help! Today would also be the storm of the season...we are lucky the plastic was still intact!
More digging? Yes! This is a drainage system for the back of the farm so things stay a little drier!
New catch basin to keep water flowing in the right direction
Terminating our first cover crop and now are seeding in some new crops to continue building the soil heath
Spencer and Collin my wonderful brothers helping digging out old foundations on the barn
Mix mix mix, new foundations for the barn, she shouldn't go anywhere now!
Concrete board going in to keep barn protected from erosion
Finally that time, bows for GH1 are under way
More layout for barn additions and improvements!
Building our new tool shed space
Malanowski Farm dropping fill for the new addition
Greenhouse construction continues! Cross bows going up!
The new road, looks great!
We took a speedy turn to finish the metal structure of the GH, next-up frame work for the endwalls
Polycarbonate goes on GH1, so close now
One side complete, on to the next!
My father and I contemplating the next step on the roof vent for GH1
We finally have plastic coverings on all greenhouse structures
Digging trenches for the GH propane heating system
To be continued...